Finn Biogas was contracted to complete a turnkey biogas plant to a client in the Philippines. The client operated large scale chicken farming and meat production, which resulted in approximately 60 tonnes per day of manure. Due to the nature of their operations, they required a waste-to-energy solution.
The project involved a complete turnkey project and involved the following stages
The project spanned over 18 months from project conception to commissioning.
One of the feedstocks for this biogas plant was the products removed from the waste water project which Finn Biogas also built for the same client as part of a separate project.
Location: Mindanao, Philippines
Project Length: 18 months
Waste Stream: Chicken manure and waste water
Biogas Project Size: 1,000 kW/hr