Finn Biogas was engaged to undertake a detailed feasibility study for a meat factory in NSW, Australia. Their operations required that a biogas plant be built to help reduce waste and energy costs.
The feasibility study was taken over the course of two months as Finn Biogas implemented a small scale assessment lab on site to determine the exact quantities and streams of waste. With the information collected, a detailed feasibility report was produced with results showing the biogas production capacity.
Location: New South Wales, Australia
Project Length: 2 Months
Waste Stream: Red meat production
Biogas Project Size: N/A