The Finn Biogas team constructed 4 biogas plant tanks as part of an industrial waste-to-energy project attached to a milk processing factory in New Zealand.
The tanks ranged in size from a small 175m3 process tank, to the largest which was 5,000m3.
Alternative renewables for more control over energy exports.
The solution was found in the installation of a low-pressure biogas storage dome on their site which could be used to modulate the flow of gas between the landfill and the generator infrastructure.
Biogas Plant Expansion – Addition of CHP at Wastewater Treatment Plant.
A wastewater treatment authority with an existing high-rate anaerobic lagoon required an experienced design team for the upgrade of their plant to include a Combined Heat and Power (CHP) generator.
Turnkey biogas plant delivery, Philippines. Our client operates large scale chicken farming and meat production, which resulted in approximately 60 tonnes per day of manure.
The Finn Biogas team constructed 4 biogas plant tanks as part of an industrial waste-to-energy project attached to a milk processing factory in New Zealand.
The tanks ranged in size from a small 175m3 process tank, to the largest which was 5,000m3.
Project commissioning and biological start-up support for an anaerobic digestion plant attached to the red meat processing facility in San Jose, Costa Rica.
Finn Biogas was contracted by a large red meat processing facility wanting to digest their waste streams as part of an integrated renewables energy precinct.
A pre-existing covered anaerobic lagoon (CAL) at a red meat abattoir was studied by Finn Biogas to understand and improve its operation.
New South Wales, Australia.