Biogas Plant Digesters Construction

The Finn Biogas team constructed 4 biogas plant tanks as part of an industrial waste-to-energy project attached to a milk processing factory in New Zealand. The tanks ranged in size from a small 175m3 process tank, to the largest which was 5,000m3.

Working with a multitude of sub-contractors and in challenging, high-wind conditions, the team undertook the project with expert efficiency and skill, ensuring at all times that safety and quality were top priorities.

Location: Christchurch, New Zealand

Project Length: 4 Months

Waste Stream: Dairy Waste

Biogas Project Size: N/A